Home › Analytics › Critical Infrastructure Monitoring

Critical Infrastructure Monitoring Coming soon

Monitoring of corridors and key sites — railroads, highways, pipelines, power lines, ports and more — for new construction, vegetation encroachment, floods, fires and slides.

Trees in power line right of way — Pennsylvania, USA, 2021-09-07 to 2024-08-27 (before, after, detections: Trees in ROW, Trees at ROW edge)
Trees in power line right of way — Pennsylvania, USA, 2021-09-07 to 2024-08-27 (before, after, detections: Trees in ROW, Trees at ROW edge)

Corridor monitoring is the responsibility of many organizations owning a pathway along significant stretches, most of which have Right of Way (ROW) over their corridor. Critical site monitoring has a similar responsibility over a large number of isolated installations.

Corridor operators include:

Critical site operators include:

All of these operators have a need and often obligations to monitor and handle a wide range of changes at or near the locations they are responsible for, including:

Some of these, such as new construction, are flagged automatically; for the others, EarthToDate's frequent, up-to-date imagery lets you inspect your corridors and sites yourself, as often as you need.

Not supported at this time:

The leading cause of pipeline failures is third-party interference — unauthorized digging, construction and machinery on the right-of-way. EarthToDate New Construction Detection flags new buildings, and its land preparation class catches clearing and grading, often the earliest warning before a dig. Separating greenhouses keeps farm plastic from being mistaken for encroachment where corridors cross farmland.

For power lines, vegetation growing into the conductor clearance zone is a leading cause of outages and wildfire ignition (regulated in the US under NERC FAC-003). EarthToDate flags where vegetation is present and growing; the clearance height itself needs LiDAR or stereo imagery.

Limits: optical imagery sees surface signs only — not buried-pipe condition or millimetre-scale ground motion, which need radar interferometry (InSAR) — and a dig opened and backfilled between passes can be missed. Slow threats such as regrowth, equipment staging, erosion and creeping encroachment are where continuous screening is strongest.

New woody growth along 230kV line — New Brunswick, Canada, 2018-07-21 to 2024-07-19 (before, after, detections: New woody growth, Trees at ROW edge, Trees in ROW)
New woody growth along 230kV line — New Brunswick, Canada, 2018-07-21 to 2024-07-19 (before, after, detections: New woody growth, Trees at ROW edge, Trees in ROW)
New warehouse construction — Inland Empire, California, USA, 2019-06-28 to 2024-07-01 (before, after, detections: New construction)
New warehouse construction — Inland Empire, California, USA, 2019-06-28 to 2024-07-01 (before, after, detections: New construction)
Land preparation forest clearing — Grünheide (Tesla Giga Berlin), Germany, 2019-07-26 to 2020-08-16 (before, after, detections: Excavation / land prep, New construction, Trees in ROW)
Land preparation forest clearing — Grünheide (Tesla Giga Berlin), Germany, 2019-07-26 to 2020-08-16 (before, after, detections: Excavation / land prep, New construction, Trees in ROW)
Rockslide scars on forested slopes — Guizhou, China, 2025-05-12 to 2025-07-26 (before, after, detections: Slide / washout)
Rockslide scars on forested slopes — Guizhou, China, 2025-05-12 to 2025-07-26 (before, after, detections: Slide / washout)
Debris flow across road and power line — Palm Springs area, California, USA, 2023-08-06 to 2023-08-28 (before, after, detections: Ground change (debris / earthworks), Slide / washout)
Debris flow across road and power line — Palm Springs area, California, USA, 2023-08-06 to 2023-08-28 (before, after, detections: Ground change (debris / earthworks), Slide / washout)
Flash flood scour and mud — Derna, Libya, 2023-09-07 to 2023-10-17 (before, after, detections: Ground change (debris / earthworks), Flood (new water))
Flash flood scour and mud — Derna, Libya, 2023-09-07 to 2023-10-17 (before, after, detections: Ground change (debris / earthworks), Flood (new water))
River flood extent — Danube floodplain near Bratislava, Slovakia, 2024-09-08 to 2024-09-21 (before, after, detections: Flood (new water))
River flood extent — Danube floodplain near Bratislava, Slovakia, 2024-09-08 to 2024-09-21 (before, after, detections: Flood (new water))
Flood recession — Danube floodplain near Bratislava, Slovakia, 2024-09-21 to 2024-10-18 (before, after, detections: Flood recession (water receded))
Flood recession — Danube floodplain near Bratislava, Slovakia, 2024-09-21 to 2024-10-18 (before, after, detections: Flood recession (water receded))
Dry fuel near power line — Serra da Estrela, Portugal, 2022-07-08 to 2022-08-02 (before, after, detections: Dry fuel)
Dry fuel near power line — Serra da Estrela, Portugal, 2022-07-08 to 2022-08-02 (before, after, detections: Dry fuel)
Active wildfire front — Serra da Estrela, Portugal, 2022-08-02 to 2022-08-07 (before, after, detections: Active fire, Burn scar)
Active wildfire front — Serra da Estrela, Portugal, 2022-08-02 to 2022-08-07 (before, after, detections: Active fire, Burn scar)
Wildfire smoke plume — Serra da Estrela, Portugal, 2022-08-02 to 2022-08-07 (before, after, detections: Smoke)
Wildfire smoke plume — Serra da Estrela, Portugal, 2022-08-02 to 2022-08-07 (before, after, detections: Smoke)
Burn scar — Serra da Estrela, Portugal, 2022-08-02 to 2022-09-11 (before, after, detections: Burn scar)
Burn scar — Serra da Estrela, Portugal, 2022-08-02 to 2022-09-11 (before, after, detections: Burn scar)
Burn scar scorched chaparral — Eaton Canyon, California, USA, 2024-12-18 to 2025-01-12 (before, after, detections: Burn scar)
Burn scar scorched chaparral — Eaton Canyon, California, USA, 2024-12-18 to 2025-01-12 (before, after, detections: Burn scar)

What you receive

Change alerts along your corridors and at your sites